New building assembly- and storagebuilding

Müllheim
Architects
wurm + wurm architekten ingenieure
Location
Müllheim
Year
2012

The assembly and storage building joins a sequence of three equal-sized buildings on the urban master plan, which wurm+wurm has developed for the factory buildings of auma in Müllheim. The cuboid building is divided by the vertical layering of the materials used are arranged with a precision designed joint pattern. Cladding panels in stainless steel, exposed concrete elements, large-format window elements and translucent polycarbonate plates as upper closure form the canon of material.
The roof, which overhangs far in the loading area is also covered homogeneous with the plastic plates at its bottom side and it evolves in lighted state into a levitating light volume..

Client
Auma Riester GmbH & Co. KG, Müllheim

New building
1.330m²

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by wurm + wurm architekten ingenieure

Reconstruction multifunctional building
Jena
Revitalization of an office building
Müllheim
New construction headquarter AUMA
Müllheim
Conversion and new construction of a production hall with service and socialtract.
Ostfildern
GFC Antriebssysteme GmbH
Coswig