ecause of the special location with the dense neighbourhood and the corner position of the new building it was designed with the influence of the heights of the buildings around. So the house was inserted in a self-evident way: There are sections cutted out of the possible volume of a ashlar in the way that the edges have relation to the other roofs and eaves. The incised surfaces are translucent, the surface of the ashlar is consistently out of natural stone. The concept of the incisions was implemented from design to the detail

The entry is right at the most representative corner. In the ground floors there is the foyer with the automatic tellers and the customer's area with the service desk. From there every floor is reachable with the central elevator or the staircase. On the four floors above are mainly offices, conference and consultation rooms. In the basement are technical and store rooms and the safe

All rooms are arranged around the central development zone. Because of the separate access the different floors could be rented individually. Inside the space could be partitioned flexible with light walls. The main construction is concrete with economical spans. As bracing of the construction the core of the development is used and structural parts of the external wall.

Client
Landesbank Baden-Württemberg

Concept and Planning
Kauffmann Theilig & Partner
Ostfildern

Project Managers
Wolfgang Ehmann, Tina Schäfer

Supervision
KTP with LBBW Stuttgart

Structural Planning
Peter und Lochner
Stuttgart

Mechanical Services
Ing.-Büro Heideker
Stuttgart

Electrical Installation
Schindler Consult IG
Stuttgart

Facade Planning
FFT Bohner
Fichtenberg

Building Physics
GN Bauphysik
Stuttgart

Ground-Survey-Report
Vees + Partner
Leinfelden-Echterdingen

Building costs total
3,0 Mill. €

Building costs KG 3+4
2,4 Mill. €

Gross Floor Area
1.500 m²

Gross Volume
5.000 m³

Working Places
46

Working Phases acc. to HOAI
1 - 9

Competition
1st Prize 07/2000

Revision
12/2004

Planning Start
03/2005

Construction Start
12/2005

Completion
09/2007

Other Projects by K T P Kauffmann Theilig & Partner

Schulungszentrum WSV Landessportschule Ruit
Ostfildern
Mercedes-Benz Gallery Berlin
Berlin
Erweiterung Industrie- und Handelskammer zu Kiel
Kiel
Neues Freibad Waldkirch
Waldkirch
Wohnungsbau an der Landesgartenschau Nagold
Nagold