Danilovsky Fort

Moscow, Rusland
Photo © Yuri Palmin
Photo © Yuri Palmin
Modell
Photo © Sergey Skuratov Architects
Photo © Yuri Palmin
Photo © Yuri Palmin
Photo © Yuri Palmin
Photo © Yuri Palmin
© Yuri Palmin
Situation
Drawing © Sergey Skuratov Architects
Site plan
Drawing © Sergey Skuratov Architects
Level 0
Drawing © Sergey Skuratov Architects
Sections
Drawing © Sergey Skuratov Architects
Elevations
Drawing © Sergey Skuratov Architects
Architecten
Sergey Skuratov Architects
Locatie
Novodanilovskaya quay, 8, Moscow, Rusland
Jaar
2008
Klant
‘Business Stroy’ - ‘MR-group’ - ‘Tehnologiya’ ltd
Function
Administrative and office center
Project organisation
‘Sergey Skuratov Architects’ ltd
Authors
S. Skuratov (lead author), A. Romanov, E. Kuznetsova, with: N. Demidov, P. karpovsky, O. Lebedeva, A. Makeeva, A. Platonov, I. S
Project stages
architectural concept, architectural project, design drawings, architectural supervision
Project
2005
Construction
2006–2008
Total object area
40 000 m²
Overground area
32 229m²
Underground area
7 078 m²
Public area
5 570 m²
Construction volume
191 564 m³
Site area
7 987 m²
Construction area
6 973 m²
Area of landscaping
2 635 m²
Number of floors
1-6-10-12
Absolute hight
50,6 m
Publications (in English)
Tatlin Mono №2 Sergey Skuratov Architects // The Plan #075, 03.07.2014

The business center is composed of three different storied vertically oriented volumes based on single story flat ground floor. Clear and rational layout idea is softened by complicated plastic forms of facades. Active rhythm of differently sized windows that accrues and fades relieves from standard boredom and monotony so inherent to architecture of all business centers.

Drawing of façade windows stresses the main peculiarity of the building - indented walls that give graceful curve to the main façade which looks to the riverside.

The two glazed consoles protruding from opposite brick towers aspire on a meeting to each other and thus unite the whole structure. Decorative brick of irregularly varying shades and tones is used for all facades. Brick mass of the whole complex soars above the ground floor structure because of its glass filled outer walls.

The whole composition enabled to make the inner yard on the roof of ground floor. In the center of this yard an artificial hill with skylights rises above lawns and flower pots. The daylight streams through directly into the main room of ground floor which can be used as central canteen.

Gerelateerde projecten

  • Passerelle Raststätte Werdenberg
    Walter Bieler AG
  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group

Magazine

Andere projecten van Sergey Skuratov Architects

Burdenko Street
Moscow, Rusland
Opera and Ballet Theatre
Perm, Rusland
Garden Quarters. Second block
Moscow, Rusland
Headquarters "Gazprom Neft"
Saint-Petersburg, Rusland
Victory Park Residences
Moscow, Rusland