Open-Air Community Theatre
© Patrick Beuchert
Open-Air Community Theatre
Photo © Patrick Beuchert
Open-Air Community Theatre
Photo © Patrick Beuchert
Open-Air Community Theatre
Photo © Patrick Beuchert
Open-Air Community Theatre
Photo © Patrick Beuchert
Open-Air Community Theatre
Photo © Patrick Beuchert
Floor plan
Drawing © 4a
Section
Drawing © 4a
Concept sketch
Drawing © 4a

Open-Air Community Theatre

 Back to Projects list
Location
Reutlingen
Year
2008

New construction of covered seating area with ticket office.

The covered seating area at the heart of the forest has a “light, open and modern” design, entirely in keeping with the clients’ wishes. The movement of the dynamic structure symbolises growth and change – the theatre blends into the natural surroundings of the forest. Approximately 1.000 seats for theatre audiences are arranged beneath the generous self-supporting roof structure. The green colour of the Alucobond cladding lends a natural appearance to the design and integrates the structure into its surroundings. Sloping joints in the metal cladding follow a natural (dis-)order, the colouring and structure of the forest being picked up in the façade.

Client
Naturtheater Reutlingen e.V.

Construction period
09/2007 to 06/2008

Construction costs
approx. 1.1 million euros

Gross floor area
approx. 1065 m²

Gross cubic volume
approx. 6797 m³

Service phases
1 to 9

Project team
Barbara Croonenberg, Rüdiger Ostermayer

Awards
Baden-Württemberg timber construction award 2009
Exemplary constructions in Reutlingen 2001-2008

Other Projects by 4a Architekten

Emser Thermal Baths
Bad Ems
Evangelical Grammar School Bad Marienberg
Bad Marienberg
Wilhelm-Maybach-School
Stuttgart
Indoor swimming pool Schwabach
Schwabach
Solebad Bad Wimpfen
Bad Wimpfen