Office Building Oskar

Munich
Lobby
Foto © Fantomas
Light Installation
Foto © Fantomas
Recpetion Desk
Foto © Fantomas
Architekten
Arnold / Werner
Jahr
2018
Kosten
Vertraulich
Stockwerke
Vertraulich
Bauherrschaft
Hines
Team
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Dazugehörige Projekte

  • Sino-French Centre
    Atelier Z+
  • Community CROPS Food Center
    Min | Day
  • Bio-Lake Offices
    Zephyr Architects
  • LifeCycle Tower - LCT ONE
    Architekten Hermann Kaufmann
  • Nachnutzung Flughafen Tempelhof
    Arnold und Gladisch Architekten

Magazin

Andere Projekte von Arnold / Werner

Bobbeaman Musicclub
München
Beachhouse
Seeheim, Starnberger See
Wohn- / Bürohaus Baldestraße
München
Um- und Ausbau eines Dachgeschosses
München
James T. Hunt Bar
München
Alpenchalet Walchensee
Walchensee