SCHNEIDER + SCHUMACHER
10.12.2011 – 29.04.2012
Opening: Fri, 9.12.2011, 19:00
schneider+schumacher architectural studio will present its work to mark the completion of the Städel Museum and the conversion of the Dresdner Bank Silver Tower into the Deutsche Bahn administration building. The selected projects will be shown as large-scale projections in an installation conceived exclusively for DAM by Meso. New photographs by Kirsten Bucher, who presents an authentic snapshot of the buildings both inside and out, are combined with archived images and sounds to produce an atmospheric spatial choreography which illustrates the studio’s work and intension.
The exhibition will mark the beginning of a new series on architects in the Rhine-Main region.
Opening: Fri, 9.12.2011, 19:00
schneider+schumacher architectural studio will present its work to mark the completion of the Städel Museum and the conversion of the Dresdner Bank Silver Tower into the Deutsche Bahn administration building. The selected projects will be shown as large-scale projections in an installation conceived exclusively for DAM by Meso. New photographs by Kirsten Bucher, who presents an authentic snapshot of the buildings both inside and out, are combined with archived images and sounds to produce an atmospheric spatial choreography which illustrates the studio’s work and intension.
The exhibition will mark the beginning of a new series on architects in the Rhine-Main region.
When
12.10.2011
04.29.2012
Where
Deutsches Architekturmuseum
Schaumainkai 43
Frankfurt a.M.
Germany
Bau der Woche
Jobs
Posch Walther Sailer Architekten GmbH, Neuried bei München
Blocher Blocher Partners, Stuttgart
Dohle + Lohse Architekten GmbH, Braunschweig


